Step 1: Connect Lan And Power Cable To Rack; Double-Pulse Test System Turn-On And Turn-Off - Keysight PD1500A System Installation Manual

Double-pulse test rack and safety enclosure
Hide thumbs Also See for PD1500A:
Table of Contents

Advertisement

Step 1: Connect LAN and Power Cable to Rack

Step 1: Connect LAN and Power Cable to Rack

Before powering the system on, connect a LAN cable from the host computer to
the side of the DPT Rack and Safety Enclosure. Connect the AC power cord to
the rack.
Figure 1

Double-Pulse Test System Turn-On and Turn-Off

With all of the test instruments and test fixture installed in the rack, it is time to
turn on the system.
1 Connect the AC Power cable to the AC Jack on the side panel of the DPT Rack
2 Plug the other end of the cable in an appropriate AC outlet. See "Electrical
3 Ensure the Emergency Stop button is pulled out.
4 Turn the large round knob on the DPT Rack and Safety Enclosure to the right
5 Press the Reset button. Test instruments turn on. You should hear a few clicks
6 If the individual test instruments are not already turned on, turn them on now.
Keysight Double-Pulse Test System Installation Guide
Right side of DPT Rack showing LAN and Power Connections
and Safety Enclosure.
and Environmental Requirements" on page 18.
(vertical) to power the system. The fans start but test instruments do not turn
on. See the figure below.
as the safety relays energize. The system is now operational.
Turn-on and Software Installation
LAN Port. Connect to Host
computer. NOTE: Connect
this port directly to a PC via
a LAN cable. There is no
wireless connectivity to the
DPT Test System.
AC Power to Rack.
IEC60320 C19 receptacle
200 to 240 VAC only.
Ventilation fan.
Do not block.
49

Advertisement

Table of Contents
loading

Table of Contents