Connections On Back Of Test Fixture - Keysight PD1500A System Installation Manual

Double-pulse test rack and safety enclosure
Hide thumbs Also See for PD1500A:
Table of Contents

Advertisement

Connections on Back of Test Fixture

Connections on Back of Test Fixture

BNC from 33512B
Waveform
Generator Ext. Trig
High Voltage
Banana
Jacks from
Safety Box
(under work
surface)
Connector
reserved for
future use. Do
not attempt
to connect
anything here.
Figure 7
Back of Test Fixture and Cable Installation
Figure 8
Back of Test Fixture with Cables
Keysight Double-Pulse Test System Installation Guide
Ethernet from
USB port
LAN Switch
(not used)
Install Test Fixture in the Safety Enclosure Hood
50 Pin Connector from
Safety Box (under Work
Surface)
Power Connector
from 48V Power
Supply
41

Advertisement

Table of Contents
loading

Table of Contents