Re-crating the Rack and Safety Enclosure for Shipping

Re-crating the Rack and Safety Enclosure for Shipping
If you need to ship the Double-Pulse Test system to a different location – beyond
where it can be rolled on its casters – prepare the PD1500A system for shipping
per the following instructions.
A suitable shipping crate, preferably wod, is required to ship the PD500A Rack
and Safety enclosure.
1 Turn the system OFF with the Power On/Off Switch.
2 Unplug the AC power cord from the test system Rack and Safety enclosure.
3 Remove all test modules, oscilloscope probes, any loose parts from the DPT
4 Remove the DSOS104A oscilloscope and Test Fixture from the DPT rack work
5 Secure all cables on the Work Surface
6 While it is not necessary to remove the other test instruments (the Heinzinger
7 Remove any loose pieces (installation bolts, cables, etc. before shipping.
8 Wrap the Rack and Safety Enclosure in plastic and foam before putting it in
9 Place the Rack and Safety Enclosure inside the shipping crate. Lock the
When transporting the Rack and Safety Enclosure for long distances or outside a
building always make sure that the environmental conditions like humidity,
temperature and air pollution never exceed the related instrument specification.
The ambient temperature should not exceed -20 °C to +60 ° C.
Keysight Double-Pulse Test System Installation Guide
IMPORTANT: For service and calibration of individual instruments in
the PD1500A test system, DO NOT SHIP THE ENTIRE Rack and Safety
Enclosure to Keysight. Instead, remove the individual
instrument(s), repackage them in their original shipping container,
and return to Keysight. Attach a tag indicating the type of service
required, your return address, and model number of the device to
be repaired. Refer to the instructions included with each
instrument for return instructions.
work surface. These should be packaged separately for shipping.
surface. These should be re-packaged in their original shipping boxes for
shipping.
High Voltage Power Supply, B2902A SMU, and 33512B Waveform Generator)
from the rack before shipping, you must insure that they are securely attached
to the test rack.
the shipping crate. This will protect the rack and safety hood from dust, dirt,
and scratches during shipping.
casters so that the rack does not shift during transportation.
Uncrate the Rack and Safety Enclosure
31