Uncrate the Rack and Safety Enclosure

Uncrate the Rack and Safety Enclosure
Use the following procedure to remove the rack from the shipping crate. Keysight
recommends using two people to uncrate the Rack and Safety Enclosure. Wear
work gloves to protect against splinters.
1 Make certain you have adequate room to uncrate the Rack and Safety
Figure 1
PD1500A Rack and Safety Enclosure Shipping Crate
2 Unlatch the safety latches on the front of the shipping crate. These latches
3 Carefully remove the ramp from the crate. Position the ramp so that the top of
4 Remove any packing materials from the Rack and Safety Enclosure.
5 Carefully roll the test rack and safety enclosure down the ramp.
28
Enclosure. A minimum of 2 M (6 ft) is required in front of the crate (ramp+
Rack and Safety Enclosure). See Figure 1 below.
secure the ramp (front of the shipping crate) to the sides.
the ramp rests on the shipping crate foot as shown in Figure 1.
Make sure that the casters on the bottom of the rack are
unlocked before you roll the rack down the ramp.
Keysight recommends, if possible, that you save the shipping crate,
oscilloscope carton, and the Test Fixture carton if you plan to ship
the rack to a different location. Refer to "Re-crating the Rack and
Safety Enclosure for Shipping" on page 31 for detailed information.
Uncrate the Rack and Safety Enclosure
Safety
Latches
Minimum of 2 M (6 ft.)
Keysight Double-Pulse Test System Installation Guide