System Calibration Procedure (Autocal)
Gate Voltage Calibration – V
Hardware Setup:
Figure 6
Setup for Gate Voltage Calibration
Procedure:
After setting up the hardware as described above, click Start to perform the
calibration and continue to the Gate Voltage Source Calibration.
Keysight Double-Pulse Test System Installation Guide
GS
– Remove the I/NO Jumper on the Low-Side Gate Drive Module.
– Remove the V/NC Jumper on the Low-Side Gate Drive Module.
– Connect the N2873A V
Drive Module.
– Connect the BNC to Banana Adapter to the BNC to SMA calibration cable.
– Connect the SMA end of the cable to the SMA connector on the Low-Side
Gate Drive Module.
– Connect the banana plug cable to Channel 1 Force terminals of the
B2902A SMU (2-wire measurement).
– The Safety Enclosure hood may be left open.
1251-2277
Banana - BNC
Adapter
Low-Side
Gate Drive
Module
A strip of 10 header jumpers (Keysight part number 1258-0225)
were supplied with your PD1500A for use during calibration.
PD1500A Double-Pulse Test System Calibration
/V
Probe
GE
/V
Gate Voltage Probe to the Low-Side Gate
GS
GE
8121-2816
BNC - SMA
Cable
N2873A
V
/V
Gate
GS
GE
Voltage Probe
Remove I/NO (Normally Open)
Jumper.
Remove V/NC (Normally
Closed) Jumper
65