Step 4 Wrap the pipes with thermal insulation foam.
----End

3.5.2.1.2 Side Pipe Routing

Context
Tools: 75# open-end wrench, 36# open-end wrench, 15# socket wrench (used for removing
pipe hold hoops), utility knife (used for cutting thermal insulation foam), sealant (used for
pasting thermal insulation foam), screw thread sealant
Procedure
Step 1 Cut the thermal insulation foam around the pipe hold hoop using a utility knife, and tear the
foam.
Step 2 Loosen the left knocking-off padding cover of the cabinet using a Phillips screwdriver. Take
out the cover and remove the knocking-off padding.
Figure 3-35 Removing the knocking-off padding cover
The direction in which the main pipes are tightened by using hold hoops is for reference only.
The onsite situation prevails.
Step 3 Remove the elbow hoops securing the horizontal pipe using a 15# socket wrench, and then
take out the bend.
Issue 06 (2020-01-13)