NetCol8000-C(070-260) In-room Chilled Water Smart
Cooling Product
User Manual
Figure 4-25 Fan commissioning
The fan commissioning item is mandatory. After commissioning for a component succeeds, the system
automatically performs commissioning for the next component you selected. If commissioning fails,
startup wizard ends.
Step 6 View the commissioning result.
Issue 06 (2020-01-13)
Figure 4-26
is displayed if component commissioning succeeds.
Figure 4-26 Commissioning successfully
Figure 4-27
is displayed if component commissioning fails, which ends startup wizard
commissioning.