After you power on the smart cooling product for the first time, the screen displays the
Wizard Commissioning. You can select to commission the smart cooling product or not. If
you select to commission it at other times, choose Maint > Wizard Startup to start
commissioning. If wizard commissioning is interrupted due to a fault, clear the alarm, and
then perform wizard commissioning again.
Tapping No or Exit, submission timeout, and system exception all result in commissioning
failures. Choose Maint > Wizard Startup to enter the Wizard Startup screen for new
commissioning.
Procedure
Step 1 On the home screen, choose Maint > Wizard Startup, as shown in
Figure 4-22 Startup wizard
Step 2 Tap Yes. The checking before startup screen is displayed, as shown in
Issue 06 (2020-01-13)
For the initial startup wizard, Last record is in grey, indicating that the operation is not allowed.
For the non-initial startup wizard, choose Last record and you can view the last startup wizard
report.