Stacking Operation Test - JCM GLOBAL UBA Pro Series Operation And Maintenance Manual

Universal banknote acceptor
Table of Contents

Advertisement

Section 6
3. Apply electrical power.
4. Confirm that the
lit.
Figure 6-104 DI
Figure 6-104 DIP Switch Test 2
5. To start the Test, set the DIP Switch #8 to
(Figure 6-105).
Figure 6-105 DIP
DIP Switch #8 OFF
ON
1
2
3
Figure 6-105 DIP Switch Test 3
6. Set the DIP Switches to
Figure 6-106 DIP
DIP Switches #1, #3, #5, #7 OFF
ON
1
2
3
Figure 6-106 DIP Switch Test 4
7. Confirm that the
Figure 6-107 DI
Figure 6-107 DIP Switch Test 5
8. Set the DIP Switches to
Figure 6-108 DIP
DIP Switches #2, #4, #6 OFF
ON
1
2
3
Figure 6-108 DIP Switch Test 6
9. The
Green
LED will be lit.
Figure 6-109 DI
Figure 6-109 DIP Switch Test 7
10. Set the UBA Pro DIP Switch #8 to
test.
P/N 960-000211R_Rev. A
UBA™ Pro Series Universal Banknote Acceptor
Green
and
Red
Status LEDs are
Green Red
OFF
4
5
6
7
8
(Figure 6-106).
OFF
4
5
6
7
8
Red
LED is lit.
Red
(Figure 6-108).
OFF
4
5
6
7
8
Green
to end the
ON

Stacking Operation Test

To perform the Stacking Operation Test, proceed as
follows:
1. Remove electrical power.
2. Set the DIP Switches as below (Figure 6-110).
Figure 6-110 Stacking Operation Test 1
DIP Switches #3, #8 ON
ON
1
2
3
Figure 6-110 Stacking Operation Test 1
3. Apply electrical power.
4. Confirm that the
lit.
Figure 6-111 St
Figure 6-111 Stacking Operation Test 2
5. To start the Test, set the DIP Switch #8 to
(Figure 6-112).
Figure 6-112 Stacking
DIP Switch #8 OFF
ON
1
2
3
Figure 6-112 Stacking Operation Test 3
6. The stacking operation will begin.
7. Set the UBA Pro DIP Switch #8 to
test.
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 2
Calibration and Testing
4
5
6
7
8
Green
and
Red
Status LEDs are
Green Red
OFF
4
5
6
7
8
to end the
ON

Advertisement

Table of Contents
loading

Table of Contents