Component Names - JCM GLOBAL UBA Pro Series Operation And Maintenance Manual

Universal banknote acceptor
Table of Contents

Advertisement

General Information

Component Names

Figure 1-4 illustrates the UBA Pro component names and locations.
Figure 1-4 UBA Pro Component Names
i
e
c
f
Installation Type
Stacking Up
Standard (SS)
a) Acceptor Head Unit
b) Frame Unit
c) Bezel
d) Cash Box
e) Upper Guide Access Lever
f) Acceptor Head Unit Release Lever
g) Cash Box Handle
h) Centering Guide Shaft
i) DIP Switches (Front)
P/N 960-000211R_Rev. A
UBA™ Pro Series Universal Banknote Acceptor
k
j
l
m
n
a
h
g
Standard Cash Box
500 Note
(SU)
Figure 1-4 UBA Pro Component Names
b
d
900 Note
j) Status LED (Orange)
k) USB Type-C Connector (Maintenance)
l) Status LED (Green)
m) Status LED (Red)
n) Bezel Connector
o) Interface Connector
p) SW1 (Bottom)
q) SW2 (Bottom)
© 2020, JAPAN CASH MACHINE CO., LTD.
1 - 5
p
q
o
ICB Box
500 Note
900 Note
Section 1

Advertisement

Table of Contents
loading

Table of Contents