Figure 4-30 Stack Motor Harness Assy. Removal 1; Figure 4-31 Stack Motor Harness Assy. Removal 2; Figure 4-32 Stack Motor Harness Assy. Removal 3 - JCM GLOBAL UBA Pro Series Operation And Maintenance Manual

Universal banknote acceptor
Table of Contents

Advertisement

Disassembly/Reassembly
Stack Motor Harness Assy.
Removal
To remove the Stack Motor Harness Assy., proceed
as follows:
1. Remove the four (4) Screws (Figure 4-30
through
a
), and remove the Stack Gear Cover
4
(Figure 4-30 b).
Figure 4-30 Stack Motor Harness Assy.
Removal 1
b

Figure 4-30 Stack Motor Harness Assy. Removal 1

2. Remove the two (2) Screws (Figure 4-31
a
).
2
Figure 4-31 Stack Motor Harness Assy.
Removal 2

Figure 4-31 Stack Motor Harness Assy. Removal 2

3. Remove the Stack Motor (Figure 4-32 a).
Figure 4-32 Stack Motor Harness Assy.
Removal 3

Figure 4-32 Stack Motor Harness Assy. Removal 3

NOTE: For the wire routing when
reassembling, ensure that both
Blue
Motor Cables are placed under the
Motor Encoder.
P/N 960-000211R_Rev. A
UBA™ Pro Series Universal Banknote Acceptor
a
1
a
a
1
3
a
a
4
2
a
&
1
a
2
a
1
a
Orange
and
Transport Motor Harness Assy.
Removal
To remove the Transport Motor Harness Assy.,
proceed as follows:
1. Remove the Tape (Figure 4-33 a) securing the
Harness.
Figure 4-33 Transport Motor Harness Assy.
a
Removal 1
Figure 4-33 Transport Motor Harness Assy.
Removal 1
2. Ensure that the Upper Cover is opened.
How to open the Upper Cover:
Slide the Levers (Figure 4-34
Centering Mechanism in the directions indicated
by Arrows before opening the Cover.
Figure 4-34 Transport Motor Harness Assy.
Removal 2
Figure 4-34 Transport Motor Harness Assy.
Removal 2
3. Remove the six (6) Screws (Figure 4-35
through
a
), and remove the Transport Gear
6
Cover (Figure 4-35 b).
© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 7
Section 4
a
&
a
) to open the
1
2
a
1
a
2
a
1

Advertisement

Table of Contents
loading

Table of Contents