Centering Motor Operation Time Test; Stacker Motor Operation Test - JCM GLOBAL UBA Pro Series Operation And Maintenance Manual

Universal banknote acceptor
Table of Contents

Advertisement

Calibration and Testing

Centering Motor Operation Time Test

To perform the Centering Motor Operation Time Test,
proceed as follows:
1. Launch the Performance Test Program (see
page 6-8).
2. Select "
CENTERING_TEST
3. Click the "
"
Start
60 b).
Figure 6-60 Centering Motor Operation Time
b
a
Figure 6-60 Centering Motor Operation
Time Test 1
4. The measured time will appear in the "Centering
Motor" area (Figure 6-61 a) on the Screen.
5. Confirm that the operation time is in the accept-
able range: 100msec to 350msec.
6. Click the "
"
Stop
61 b) to end the test.
Figure 6-61 Centering Motor Operation Time
b
a
Figure 6-61 Centering Motor Operation
Time Test 2
P/N 960-000211R_Rev. A
UBA™ Pro Series Universal Banknote Acceptor
" (Figure 6-60 a).
Screen Button (Figure 6-
Screen Button (Figure 6-
6 - 1 3

Stacker Motor Operation Test

To perform the Stacker Motor Operation Test without
the Cash Box, proceed as follows:
1. Launch the Performance Test Program (see
page 6-8).
2. Select "
STACKER_MOTOR_FWD_TEST
ure 6-62 a).
3. Click the "
"
Start
62 b).
Figure 6-62 Stacker Motor Operation Test 1
a
b
Figure 6-62 Stacker Motor Operation Test 1
4. Remove the Cash Box.
NOTE: Be sure to remove the Cash Box
to avoid the risk of damage.
5. Click the "
"
OK
start.
Figure 6-63 Stacker Motor Operation Test 2
Figure 6-63 Stacker Motor Operation Test 2
6. Confirm that the Stack Gear is spinning normally.
Figure 6-64 Stacker Motor Operation Test 3
Figure 6-64 Stacker Motor Operation Test 3
7. Click the "
"
Stop
65 a) to end the test.
Figure 6-65 Stacker Motor Operation Test 4
a
Figure 6-65 Stacker Motor Operation Test 4
© 2020, JAPAN CASH MACHINE CO., LTD.