Performance Test Without A Pc; List Of The Performance Tests Without A Pc - JCM GLOBAL UBA Pro Series Operation And Maintenance Manual

Universal banknote acceptor
Table of Contents

Advertisement

Section 6

Performance Test without a PC

List of the Performance Tests without a PC

Table 6-2 lists the items and DIP Switch settings for the Performance Test using DIP Switches without a
PC.
Table 6-2 Performance Tests without a PC and DIP Switch Settings
Test Item and Purpose
Banknote Acceptance with Cash Box
Banknote Acceptance without Cash Box
Non-Validation Banknote Acceptance with Cash Box
Non-Validation Banknote Acceptance without Cash Box
Non-Validation Banknote Reject Test with Cash Box
Feed Motor Operation Test (Forward)
Feed Motor Operation Test (Reverse)
Sensor Test
Aging Test with Cash Box
DIP Switch Test
Stacking Operation Test
PB Motor Operation Test
Centering Motor Operation Test
Stacker Motor Operation Test
Entrance Motor Operation Test (Forward)
Entrance Motor Operation Test (Reverse)
Entrance and Feed Motors Simultaneous Operation Test
(Forward)
Entrance and Feed Motors Simultaneous Operation Test
(Reverse)
*. DIP Switch #8 Setting: OFF to start test, ON to stop test.
†. This test is available when the Cash Box is correctly seated.
‡. This test is available when the Cash Box is NOT seated.
P/N 960-000211R_Rev. A
UBA™ Pro Series Universal Banknote Acceptor
Page
1
2
Page 6-17 ON ON ON ON
Page 6-17 ON ON ON
Page 6-18 ON ON ON ON
Page 6-18 ON ON ON
Page 6-19 ON ON ON ON ON
Page 6-19 ON
Page 6-20
ON
Page 6-20
Page 6-21
Page 6-21 ON ON ON ON ON ON ON ON → OFF
Page 6-22
Page 6-23
Page 6-23 ON
Page 6-24 ON
Page 6-24
Page 6-25
Page 6-25 ON
Page 6-26
ON
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 1 6
Calibration and Testing
DIP Switches
3
4
5
6
7
ON → OFF
ON → OFF
ON
ON → OFF
ON
ON → OFF
ON ON → OFF
ON → OFF
ON → OFF
ON ON → OFF
ON
ON → OFF
ON
ON → OFF
ON
ON → OFF
ON
ON → OFF
ON
ON → OFF
ON
ON → OFF
ON ON
ON → OFF
ON
ON → OFF
ON ON
ON → OFF
*
8

Advertisement

Table of Contents
loading

Table of Contents