Entrance Motor Operation Test (Reverse); Entrance And Feed Motors Simultaneous Operation Test (Forward) - JCM GLOBAL UBA Pro Series Operation And Maintenance Manual

Universal banknote acceptor
Table of Contents

Advertisement

Calibration and Testing
Entrance Motor Operation Test
(Reverse)
To perform the Entrance Motor Operation Test in the
reverse rotation, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches as below (Figure 6-129).
Figure 6-129 Entrance Motor Operation Test
DIP Switches #5, #6, #8 ON
(Reverse) 1
ON
1
2
3
Figure 6-129 Entrance Motor Operation Test
(Reverse) 1
3. Apply electrical power.
4. Confirm that the
lit.
Figure 6-130 E
Figure 6-130 Entrance Motor Operation Test
(Reverse) 2
5. Lift up on the Upper Guide Access Lever to open
the UBA Pro's Cover
6. To start the Test, set the DIP Switch #8 to
(Figure 6-131).
Figure 6-131 Entrance Motor Operation Test
DIP Switch #8 OFF
(Reverse) 3
ON
1
2
3
Figure 6-131 Entrance Motor Operation Test
(Reverse) 3
7. The Rollers will start running in the reverse
direction when the Feed Motor functions prop-
erly.
Figure 6-132 Entrance Motor
Figure 6-132 Entrance Motor Operation Test
(Reverse) 4
8. Set the UBA Pro DIP Switch #8 to
test.
P/N 960-000211R_Rev. A
UBA™ Pro Series Universal Banknote Acceptor
4
5
6
7
8
Green
and
Red
Status LEDs are
Green Red
OFF
4
5
6
7
8
to end the
ON
Entrance and Feed Motors 
Simultaneous Operation Test (For-
ward)
To perform the Motor Operation Test of the Entrance
Motor and the Feed Motor in the forward rotation at the
same time, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches as below (Figure 6-133).
Figure 6-133 Entrance and Feed Motors
DIP Switches #1, #6, #8 ON
Simultaneous Speed Test (Forward) 1
ON
1
2
3
Figure 6-133 Entrance and Feed Motors 
Simultaneous Speed Test (Forward) 1
3. Apply electrical power.
4. Confirm that the
lit.
Figure 6-134 E
Figure 6-134 Entrance and Feed Motors 
Simultaneous Speed Test (Forward) 2
5. Lift up on the Upper Guide Access Lever to open
the UBA Pro's Cover
6. To start the Test, set the DIP Switch #8 to
(Figure 6-135).
Figure 6-135 Entrance and Feed Motors
DIP Switch #8 OFF
Simultaneous Speed Test (Forward) 3
ON
1
2
3
Figure 6-135 Entrance and Feed Motors 
Simultaneous Speed Test (Forward) 3
7. The Rollers will start running in the forward
direction when the Entrance and Feed Motors
function properly.
Figure 6-136 Entrance and
Figure 6-136 Entrance and Feed Motors 
Simultaneous Speed Test (Forward) 4
8. Set the UBA Pro DIP Switch #8 to
test.
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 5
4
5
6
7
8
Green
and
Red
Status LEDs are
Green Red
OFF
4
5
6
7
8
to end the
ON
Section 6

Advertisement

Table of Contents
loading

Table of Contents