Calibration; When To Calibrate; Placing Reference Paper; Sensor Calibration - JCM GLOBAL UBA Pro Series Operation And Maintenance Manual

Universal banknote acceptor
Table of Contents

Advertisement

Calibration and Testing

Calibration

This section provides instructions for performing a
calibration of the UBA Pro Sensors.

When to Calibrate

Calibration should be performed when one of the
following five (5) conditions occur:
The Unit is disassembled or reassembled.
One of Sensors is removed or replaced.
The UBA Pro Main Board is removed or replaced.
Dirt adheres to the Sensors (See "Cleaning
Procedure" on page 2-17.).
The Banknote Acceptance Rate becomes drastically
degraded.

Placing Reference Paper

NOTE: Do not touch the Paper Surfaces on
either side of the KS-101 Reference Paper
(Figure 6-20).
Figure 6-20 KS-101
Paper
Surface

Figure 6-20 KS-101 Reference Paper

Perform the following steps to properly place a
selected Reference Paper (KS-101) into the UBA
Pro Unit.
1. Lift up on the Upper Guide Access Lever to open
the UBA Pro's Cover (Figure 6-21 a).
2. Slide the selected Reference Paper (Figure 6-21
b) into the Unit until its Catch Edges evenly
touch both the left and right side of the Frame
(Figure 6-21
).
A
Figure 6-21 Placing Reference Paper 1
ID Sticker
Slide In
A
NOTE: Place the Reference Paper upward so
the ID Sticker is visible; otherwise, calibration
will not be performed correctly.
Figure 6-21 Placing Reference Paper 1
P/N 960-000211R_Rev. A
UBA™ Pro Series Universal Banknote Acceptor
KS-101
a
b
3. Firmly close the Upper Guide (Figure 6-22 a)
until it "clicks" in place, and ensure that both
sides are tightly closed and locked.

Figure 6-22 Placing Reference Paper 2

a
Click
Figure 6-22 Placing Reference Paper 2

Sensor Calibration

To calibrate the UBA Pro sensors, proceed as 
follows:
1. Remove electrical power from the UBA Pro Unit.
2. Set DIP Switches as below (Figure 6-23).
Figure 6-23 Sensor Calibration 1
DIP Switch #8 ON
ON
1
2
3
Figure 6-23 Sensor Calibration 1
3. Connect the UBA Pro Unit to the PC.
NOTE: Refer to Figure 6-1 for the
necessary Tool and Harness
Connections and USB Cable Type
Requirements respectively.
4. Apply electrical power to the UBA Pro Unit.
5. The
Green
and
Red
6. Launch the "
JCM Tool Suite Standard Edition
Application.
7. Click and hold-down the "
Down Menu.
8. Select "
Sensor Adjustment
Figure 6-24 Sensor Calibration 2
Figure 6-24 Sensor Calibration 2
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 5
Section 6
4
5
6
7
8
Status LEDs will be lit.
"
" Pull-
Service Mode
" (Figure 6-24 a).
a