Entrance And Feed Motors Simultaneous Operation Test (Reverse) - JCM GLOBAL UBA Pro Series Operation And Maintenance Manual

Universal banknote acceptor
Table of Contents

Advertisement

Section 6
Entrance and Feed Motors 
Simultaneous Operation Test
(Reverse)
To perform the Motor Operation Test of the Entrance
Motor and the Feed Motor in the reverse rotation at the
same time, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches as below (Figure 6-137).
Figure 6-137 Entrance and Feed Motors
DIP Switches #2, #5, #6, #8 ON
Simultaneous Speed Test (Reverse) 1
ON
1
2
3
Figure 6-137 Entrance and Feed Motors 
Simultaneous Speed Test (Reverse) 1
3. Apply electrical power.
4. Confirm that the
lit.
Figure 6-138 E
Figure 6-138 Entrance and Feed Motors 
Simultaneous Speed Test (Reverse) 2
5. Lift up on the Upper Guide Access Lever to open
the UBA Pro's Cover
6. To start the Test, set the DIP Switch #8 to
(Figure 6-139).
Figure 6-139 Entrance and Feed Motors
DIP Switch #8 OFF
Simultaneous Speed Test (Reverse) 3
ON
1
2
3
Figure 6-139 Entrance and Feed Motors 
Simultaneous Speed Test (Reverse) 3
7. The Rollers will start running in the reverse
direction when the Entrance and Feed Motors
function properly.
Figure 6-140 Entrance and
Figure 6-140 Entrance and Feed Motors 
Simultaneous Speed Test (Reverse) 4
8. Set the UBA Pro DIP Switch #8 to
test.
P/N 960-000211R_Rev. A
UBA™ Pro Series Universal Banknote Acceptor
4
5
6
7
8
Green
and
Red
Status LEDs are
Green Red
OFF
4
5
6
7
8
to end the
ON
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 6
Calibration and Testing