Section 6
Entrance and Feed Motors
Simultaneous Operation Test
(Reverse)
To perform the Motor Operation Test of the Entrance
Motor and the Feed Motor in the reverse rotation at the
same time, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches as below (Figure 6-137).
Figure 6-137 Entrance and Feed Motors
DIP Switches #2, #5, #6, #8 ON
Simultaneous Speed Test (Reverse) 1
ON
1
2
3
Figure 6-137 Entrance and Feed Motors
Simultaneous Speed Test (Reverse) 1
3. Apply electrical power.
4. Confirm that the
lit.
Figure 6-138 E
Figure 6-138 Entrance and Feed Motors
Simultaneous Speed Test (Reverse) 2
5. Lift up on the Upper Guide Access Lever to open
the UBA Pro's Cover
6. To start the Test, set the DIP Switch #8 to
(Figure 6-139).
Figure 6-139 Entrance and Feed Motors
DIP Switch #8 OFF
Simultaneous Speed Test (Reverse) 3
ON
1
2
3
Figure 6-139 Entrance and Feed Motors
Simultaneous Speed Test (Reverse) 3
7. The Rollers will start running in the reverse
direction when the Entrance and Feed Motors
function properly.
Figure 6-140 Entrance and
Figure 6-140 Entrance and Feed Motors
Simultaneous Speed Test (Reverse) 4
8. Set the UBA Pro DIP Switch #8 to
test.
P/N 960-000211R_Rev. A
UBA™ Pro Series Universal Banknote Acceptor
4
5
6
7
8
Green
and
Red
Status LEDs are
Green Red
OFF
4
5
6
7
8
to end the
ON