Installation; Installation Process; Grounding; Side Installation - JCM GLOBAL UBA Pro Series Operation And Maintenance Manual

Universal banknote acceptor
Table of Contents

Advertisement

2 INSTALLATION

This section provides the installation and operating
instructions for the UBA™ Pro Series Universal
Banknote Acceptor (UBA Pro). It includes the fol-
lowing information:

Installation Process

DIP Switch Configurations
LED Light Flashing Pattern
Recommended Wire
Connector Pin Assignment
Preventive Maintenance
Standard Interface Circuit Schematics
Operational Flowcharts
Installation Process
The UBA Pro Frame Unit provides installation
holes for each surface.
Perform the following steps to install as the Stan-
dard (SS) and Stacking Up (SU) Installation Type.
Caution: Ensure that there is sufficient
space to clean and maintain a UBA Pro
Unit. (Refer to "Installation and
Maintenance Space Requirements" on
page 1-10.)
Caution: Do Not exert external pressure
on the UBA Pro Unit. Strong pressure on
the Unit may cause the Unit's
performance to degrade.

Grounding

Caution: Be sure to connect the Frame
Housing to the Frame Ground of the
Host Machine.
NOTE: Prepare the following Grounding
Wire, Screw and Washer for grounding:
Grounding Cable with Conductor Diameter
1.6mm or lager
M4 W Washer (Large) Pan Head, Iron/
Chromium (III), 12mm or shorter
Toothed Washer
Tightening Torque: 120N·cm
1. Install the Toothed Washer (Figure 2-1 a), the
Grounding Wire (Figure 2-1 b) and then the sin-
gle (1) specified Screw (Figure 2-1 c) into the
Frame Ground (Figure 2-1 d) in order.
P/N 960-000211R_Rev. A
UBA™ Pro Series
Universal Banknote Acceptor
S e c t i o n 2
2. Tighten the Screw to secure the Wire and Washer.
Figure 2-1 Grounding
Figure 2-1 Grounding

Side Installation

NOTE: Prepare the following Screw:
M4 Screw (The length from Frame surface
to the edge of the Screws should be within
4mm in order not to puncture the plastic
surface of the UBA Pro Unit)
Tightening Torque: 120N·cm
1. Remove the UBA Pro Unit (Figure 2-2 a) and the
Cash Box (Figure 2-2 b) from the Frame (Figure
2-2 c).
2. Place the Frame in its intended mounting loca-
tion.
3. Secure both right and left sides of the Frame into
its intended location using six (6) specified
Screws (Figure 2-2
side of the Frame.
4. Install the UBA Pro Unit and the Cash Box back
into the Frame.
Figure 2-2 Side Installation
d
2
d
3
a
b
Figure 2-2 Side Installation
© 2020, JAPAN CASH MACHINE CO., LTD.
2 - 1
Edge Side
d
Round Side
b
a
c
d
through
d
) from the out-
1
6
d
c
1
d
6
d
4
d
5

Advertisement

Table of Contents
loading

Table of Contents