2 INSTALLATION
This section provides the installation and operating
instructions for the UBA™ Pro Series Universal
Banknote Acceptor (UBA Pro). It includes the fol-
lowing information:
•
Installation Process
•
DIP Switch Configurations
•
LED Light Flashing Pattern
•
Recommended Wire
•
Connector Pin Assignment
•
Preventive Maintenance
•
Standard Interface Circuit Schematics
•
Operational Flowcharts
Installation Process
The UBA Pro Frame Unit provides installation
holes for each surface.
Perform the following steps to install as the Stan-
dard (SS) and Stacking Up (SU) Installation Type.
Caution: Ensure that there is sufficient
space to clean and maintain a UBA Pro
Unit. (Refer to "Installation and
Maintenance Space Requirements" on
page 1-10.)
Caution: Do Not exert external pressure
on the UBA Pro Unit. Strong pressure on
the Unit may cause the Unit's
performance to degrade.
Grounding
Caution: Be sure to connect the Frame
Housing to the Frame Ground of the
Host Machine.
NOTE: Prepare the following Grounding
Wire, Screw and Washer for grounding:
•
Grounding Cable with Conductor Diameter
1.6mm or lager
•
M4 W Washer (Large) Pan Head, Iron/
Chromium (III), 12mm or shorter
•
Toothed Washer
•
Tightening Torque: 120N·cm
1. Install the Toothed Washer (Figure 2-1 a), the
Grounding Wire (Figure 2-1 b) and then the sin-
gle (1) specified Screw (Figure 2-1 c) into the
Frame Ground (Figure 2-1 d) in order.
P/N 960-000211R_Rev. A
UBA™ Pro Series
Universal Banknote Acceptor
S e c t i o n 2
2. Tighten the Screw to secure the Wire and Washer.
Figure 2-1 Grounding
Figure 2-1 Grounding
Side Installation
NOTE: Prepare the following Screw:
•
M4 Screw (The length from Frame surface
to the edge of the Screws should be within
4mm in order not to puncture the plastic
surface of the UBA Pro Unit)
•
Tightening Torque: 120N·cm
1. Remove the UBA Pro Unit (Figure 2-2 a) and the
Cash Box (Figure 2-2 b) from the Frame (Figure
2-2 c).
2. Place the Frame in its intended mounting loca-
tion.
3. Secure both right and left sides of the Frame into
its intended location using six (6) specified
Screws (Figure 2-2
side of the Frame.
4. Install the UBA Pro Unit and the Cash Box back
into the Frame.
Figure 2-2 Side Installation
d
2
d
3
a
b
Figure 2-2 Side Installation
© 2020, JAPAN CASH MACHINE CO., LTD.
2 - 1
Edge Side
d
Round Side
b
a
c
d
through
d
) from the out-
1
6
d
c
1
d
6
d
4
d
5