Operational Flowchart (Continued 1); Figure 21 Dbv-400 Operational Flowchart (Validation); Figure 22 Dbv-400 Operational Flowchart (Stacking) - JCM GLOBAL DBV Series Integration Manual

Hide thumbs Also See for DBV Series:
Table of Contents

Advertisement

Operational Flowchart (Continued 1)

Figure 21 depicts Part Two of a typical DBV-400 Validation Banknote acceptance flow process.
A
NO
a
YES
NO
b
YES
c
NO
d
YES
D
f
NO
g
YES
i
B
*1). When an abnormal signal is received, remove and reapply Power to the DBV-400 Unit after resolving the problem, or send
a RESET Command from the Host Machine.
Figure 22 depicts Part Three of a typical DBV-400 Stacking Banknote acceptance flow process.
B
a
YES
b
NO
C
*2). When a "Cash Box Full" Signal is received, retrieve the Banknotes from the Cash Box and re-seat the Cash Box back into
the Unit. The DBV-400 Unit will automatically perform its re-initialization movement operation.
P/N 960-000175R_Rev. A {EDP #233426}
®
DBV
Series Banknote Validator (DBV-400) Integration Guide
e
NO
h
YES
D
j

Figure 21 DBV-400 Operational Flowchart (Validation)

c

Figure 22 DBV-400 Operational Flowchart (Stacking)

A) From "Initialize" Flow (See Figure 20)
a) Is the Banknote Authentic?
b) Is the Banknote acceptable?
c) Denomination Signal Output
d) Has STACK Command been received?
D) To "f" function on this chart
e) Return the Banknote
f) Transporting the Banknote
g) Is the Banknote transported to Stacker?
h) Retried Acceptance Operation three times?
i) VEND Signal Output
D) To "f" function on this chart
B) To "Stacking" Flow (See Figure 22)
j) Stop operation (Abnormal Signal Output)(*1)
B) From "Validation" Flow (See Figure 21)
a) Stack the Banknote
b) Is the Cash Box full?
C) To "Initializing" flow (See Figure 20)
c) Stop operation (Stacker Full Signal Output)(*2)