Performance Test Using A Pc; List Of Uba Pro Performance Tests; Launch Performance Test Program; Banknote Acceptance Test With Cash Box - JCM GLOBAL UBA Pro Series Operation And Maintenance Manual

Universal banknote acceptor
Table of Contents

Advertisement

Section 6

Performance Test Using a PC

List of UBA Pro Performance Tests

Table 6-1 lists the test items for the UBA Pro Unit
Performance Test using a PC.
Table 6-1 List of the UBA Pro Performance Tests
Test Item

Banknote Acceptance Test with Cash Box

Banknote Acceptance Test without Cash Box
Non-Validation Banknote Acceptance Test with
*
Cash Box
Non-Validation Banknote Acceptance Test without
Cash Box
Non-Validation Banknote Reject Test with Cash
*
Box
Feed Motor Speed Test (Forward)
Feed Motor Speed Test (Reverse)
Sensor Test
*
Aging Test
DIP Switch Test
Stacker Motor Operation Time Test
PB Motor Operation Time Test
Centering Motor Operation Time Test
Stacker Motor Operation Test
Entrance Motor Speed Test (Forward)
Entrance Motor Speed Test (Reverse)
Entrance and Feed Motors Simultaneous Speed
Test (Forward)
Entrance and Feed Motors Simultaneous Speed
Test (Reverse)
*. This test is available when the Cash Box is correctly seated.
†. This test is available when the Cash Box is NOT seated.

Launch Performance Test Program

To launch the Performance Test program, proceed
as follows:
1. Remove electrical power from the UBA Pro Unit.
2. Set DIP Switches as below (Figure 6-38).
Figure 6-38 Launch Performance Test Program
DIP Switch #8 ON
ON
1
2
3
Figure 6-38 Launch Performance Test Program 1
3. Connect the UBA Pro Unit to the PC. (Refer to
Figure 6-1 for the Tool Requirements and Har-
ness Connector locations.)
4. Apply electrical power to the UBA Pro Unit.
5. The
Green
and
Red
6. Launch the "
JCM Tool Suite Standard Edition
Application.
7. Click and hold-down the "
Down Menu.
P/N 960-000211R_Rev. A
UBA™ Pro Series Universal Banknote Acceptor
Page
*
Page 6-8
Page 6-9
Page 6-9
Page 6-9
Page 6-9
Page 6-10
Page 6-10
Page 6-11
Page 6-11
Page 6-11
Page 6-12
Page 6-12
Page 6-13
Page 6-13
Page 6-14
Page 6-14
Page 6-15
Page 6-15
4
5
6
7
8
Status LEDs will be lit.
"
" Pull-
Service Mode
8. Select "
Performance Test
Figure 6-39 Launch Performance Test Program
Figure 6-39 Launch Performance Test Program 2
9. The Performance Test Main Screen will appear
(Figure 6-40).
Figure 6-40 Launch Performance Test Program
Figure 6-40 Launch Performance Test Program 3
Banknote Acceptance Test with Cash
Box
To perform the Acceptance Test validating Banknotes
with the Cash Box installed, proceed as follows:
1. Ensure that the Cash Box is properly installed.
2. Launch the Performance Test Program (see
page 6-8).
3. Select "
ACCEPT_SS_TEST
4. Click the "
Start
41 b).
5. Insert a Banknote.
6. Confirm that the UBA Pro accepts the Banknote.
7. Click the "
"
Stop
41 c) to end the test.
Figure 6-41 Banknote Acceptance Test with
b
a
c
Figure 6-41 Banknote Acceptance Test
with Cash Box
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 8
Calibration and Testing
" (Figure 6-39 a).
" (Figure 6-41 a).
"
Screen Button (Figure 6-
Screen Button (Figure 6-
a

Advertisement

Table of Contents
loading

Table of Contents