Step 6 Tap Login after the parameters are set.
Step 7 After login, tap Power-on password activation on the screen. The screen shown in
5-13
Figure 5-13 Online boot
Step 8 Tap OK and follow instructions as prompted on the screen until the success message for the
startup is displayed on the screen.
----End

5.8 Startup Wizard

Context
The startup wizard allows for commissioning of components such as the fan, humidifier and
chilled water valve. It also supports component automatic operation and automatic device
checking, and can output commissioning report.
After you power on the smart cooling product for the first time, the screen displays the
Wizard Startup. You can select to commission the smart cooling product or not. If you select
to commission it at other times, choose Maint > Wizard Startup to start commissioning.
Issue 06 (2020-03-20)
Setting Method
Enter the values as planned. For details, see values on the Modbus
settings screen.
is displayed, indicating whether to start the smart cooling product.