FusionModule5000 Smart Modular Data Center
Commissioning Guide
Figure 5-16 Selecting commissioning items
Step 5 Tap Yes. The component startup commissioning screen is displayed, as shown in
Figure 5-17 Fan commissioning
Step 6 View the commissioning result.
Issue 06 (2020-03-20)
If the system is not configured with the humidifier components, the humidifier commissioning items
will not appear on the screen.
If the humidification function are disabled, you cannot select the humidifier item.
All the items are selected by default if you first enter the screen where you select commissioning
items. Except that the indoor fan item is mandatory, you can clear other commissioning items that
are not required.
The fan commissioning item is mandatory. After commissioning for a component succeeds, the system
automatically performs commissioning for the next component you selected. If commissioning fails,
startup wizard ends.
Figure 5-18
is displayed if component commissioning succeeds.