Prerequisites
If the customer server has been powered on, do not power it off unless you have obtained
prior consent from the customer.
The system has passed the power-on commissioning and is working properly.
Procedure
Step 1 Shut down servers and storage devices.
Step 2 Shut down the ECC800.
Step 3 Shut down smart cooling products.
Step 4 Switch off circuit breakers level by level to power off devices by referring to the power
supply and distribution system diagram.
Step 5 Switch off the input circuit breakers in the PDC.
Step 6 Verify whether the systems and components are intact.
Step 7 Power on the system.
Step 8 Verify whether the systems run stably after power-on.
Issue 06 (2020-03-20)
(Optional) Powering Off the Power
Supply and Distribution System
Save parameters before power-off.
Power off the devices in the normal power-off logic sequence.
If yes, go to
Step
7.
If no, locate and rectify the fault. Then go to
Copyright © Huawei Technologies Co., Ltd.