2.
Step 2 Set parameters for power distribution units on the ECC800 WebUI.
1.
2.
3.
Table 6-4 Power distribution settings for a power distribution unit
Path
Monitoring >
Power
Distribution >
Power
Distribution
Unit 1 >
Running
Parameters >
Power
Distribution
Settings
4.
----End
Issue 06 (2020-03-20)
Set the parameters for other general input units in the same way or by synchronizing
parameters.
Path: Maintenance > Parameter Sync
(Optional) To modify the branch signal name of the power distribution unit, choose
System Settings > Signal Name Modify and access the Batch Signal Configuration to
modify the name, and then tap Submit.
The following is an example of how to display two branches for power distribution unit
1.
Choose Monitoring > Power Distribution > Power Distribution Unit 1 > Display
Configuration, select Running Information Display and Running Parameters
Display corresponding to QF1 and QF2, and then tap Submit.
Configure the power distribution settings for power distribution unit 1.
Parameter Name
QF1 Rated current (QF1)
QF2 Rated current (QF2)
QF1 Branch circuit breaker in
use (QF1)
QF2 Branch circuit breaker in
use (QF2)
Set the parameters for other power distribution units in the same way or by
synchronizing parameters.
Choose Maintenance > Parameter Sync.
Copyright © Huawei Technologies Co., Ltd.
6 Commissioning the Management System
Parameter
Default
Name
Value
Setting
System CT ratio to
250.
If Rated system
current is 160 A, set
System CT ratio to
200.
Default
Description
Value
32
Rated current 32 A for
each branch.
Enable
When the parameter is
set to Disable for a
branch, all alarms of the
branch will not be
reported.
When the parameter is
set to Enable for a
branch, all alarms of the
branch will be reported.