FusionModule5000 Smart Modular Data Center
Commissioning Guide
Path
Password
Step 5 Click Submit.
----End
6.6.4.3 Creating an ECC800 on the NetEco
Prerequisites
Context
For detailed operations, see iManager NetEco 6000 Device Installation and Commissioning
Guide of the corresponding version.
Procedure
1.
2.
3.
Issue 06 (2020-03-20)
Parameter
Confirm
authentication
password
You have logged in to the NetEco client by web browser.
You have created modules or container in Data Center Planning.
Choose System > Configuration Management > Data Center Planning from the main
menu. The Data Center Planning window is displayed.
Click
in the upper left area of the Data Center Planning window to switch to the
Uncreated Device Information window.
Click
in the Uncreated Device Information window to switch to the Add Device
window. You can add an ECC800 device to the specified modular in the Add Device
window. For detailed operations, see
Copyright © Huawei Technologies Co., Ltd.
6 Commissioning the Management System
Default
Setting
Value
include at least three of the
following types: lowercase
letters, uppercase letters,
digits, and special characters)
N/A
N/A
Figure
6-23.
80