5. Loop the hopper timing belt around the hopper lock transmission gear,
and temporarily loop the other end around shaft A. (See Figure 4-91.)
CAUTION
The correct belt position is shown in Figure
4-91. The belt has been moved in other figures.
Hopper Timing Belt
Shaft "A"
Hopper Lock Transmission Gear
Figure 4-91. Hopper Timing Belt Installation
6. Install the lifter gear train cover, then place a bushing on the same
shaft as the hopper lock transmission gear. (See Figure 4-92.)
Lifter Gear Train Cover
Screws (CBS, 3×6)
Figure 4-92. Installing the Lifter Gear Train Cover
7. Secure the lifter gear train cover with 2 e-rings and 2 screws (CBS,
3×6). (See Figure 4-92.)