Commissioning And Service Compartment Identification - Siemens SIMOCODE pro C System Manual

Industrial controls. motor management and control devices
Table of Contents

Advertisement

Compartment identification

9.5 Commissioning and service compartment identification

9.5
Commissioning and service compartment identification
General safety information
Note
Operating Instructions
During commissioning and service work, also heed the relevant "Initialization Module"
Operating Instructions!
You will find the operating instructions for SIMOCODE pro at Manuals/operating instructions
(https://support.industry.siemens.com/cs/ww/en/ps/16027/man).
Commissioning the initialization module
Sequence for initial startup of a new SIMOCODE pro basic unit and a new initialization
module
Step
Description
1
Connect the SIMOCODE pro basic unit to the planned expansion modules and to the initialization module.
2
Switch on the power supply. The following LED states result:
The "DEVICE" LED lights up green
The "BUS" LED lights up or flashes green when the bus is connected
The "GEN.FAULT" LED flashes red
At the same time, the "Fault - parameterization" fault message is output.
3
Parameterize SIMOCODE pro with a PC with the SIMOCODE ES (TIA Portal) software installed. For this,
connect the PC/PG to the system interface with the PC cable (see the figure below) or to the basic unit via the
communication bus.
4
Acknowledge the pending fault either locally on the device or via the SIMOCODE ES software by means of
the "TEST/RESET button".
Figure 9-5
170
Connecting a PC to a SIMOCODE pro basic unit
System Manual, 05/2019, A5E40507475002A/RS-AD/004
SIMOCODE pro

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents