Mounting Of The Operator Panel And Operator Panel With Display - Siemens SIMOCODE pro C System Manual

Industrial controls. motor management and control devices
Table of Contents

Advertisement

12.1.6

Mounting of the operator panel and operator panel with display

The operator panels are designed for installation in the front panels of motor control centers,
for example, or in control cabinet doors.
To install, proceed as follows:
Table 12- 2
Step
Figure 12-8
SIMOCODE pro
System Manual, 05/2019, A5E40507475002A/RS-AD/004
Mounting, wiring, connecting, system interfaces, configuration guidelines
Sequence for installing the operator panel / operator panel with display
1
Make a cutout, e.g. in the front panel or switchgear cabinet door. Dimensions (see figure
"Mounting the operator panel" or figure "Mounting the operator panel with display").
2
Position the operator panel or the operator panel with display in the cutout.
3
Snap the four mounting brackets onto the operator panel.
4
Lock the operator panel in position by tightening the four screws on the securing brackets.
Mounting the operator panel