Suzuki WagonR+ RB310 Service Manual page 453

Table of Contents

Advertisement

3B-2 MANUAL RACK AND PINION
On-Vehicle Service
Tie Rod End
Installation
1) Install tie rod end lock nut (1) and tie rod end (2) to tie rod
(3). Align lock nut with mark (4) on tie rod thread.
2) Connect tie rod end to knuckle. Tighten new tie rod end nut
(1) to specified torque.
Tightening torque
Tie rod end nut (a): 40 N·m (4.0 kg-m, 29.0 lb-ft)
3) Inspect for proper toe (Refer to "Front Wheel Alignment").
4) After confirming proper toe, tighten tie rod end lock nut to
specified torque.
Tightening torque
Tie rod end lock nut (a): 45 N·m (4.5 kg-m, 32.5 lb-ft)
5) Tighten wheel to specified torque and lower hoist.
Tightening torque
Wheel bolt: 95 N·m (9.5 kg-m, 69.0 lb-ft)

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Wagonr+ rb4130Wagonr+ rb413

Table of Contents