Management operations

Life cycle
Proper management of SACE Tmax XT involves the following operations:
Figure 7
Operation
Receipt
Installation

Startup

Maintenance and
malfunctions
Decommissioning
This document describes the operations of Startup and Maintenance and malfunctions for Ekip
Touch. For other operations see the Installation Instructions and the Technical Catalog, see page
4 for references.
7 - Startup
General checks
Before startup it is necessary to perform the following checks:
Points to
inspect
Main
connections
Alarms
Parameters
1SDH002031A1002
ECN000092998
Description
Unpacking and verification of the material received
Assembly operations
General preliminary checks
Periodic checks and cleaning, management of alarms or
malfunctions
End of life and disposal
Checks
Ground connections
If present, connection and tightness of the external Neutral voltage (V0)
If included, connection of the power supply through the terminal board
If present, connection of the power supply/Ekip Supply module
If not powered, connect the Ekip TT device to Ekip Touch and make sure
that there are no alarms (details on page 18)
Configure all unit parameters appropriately
Rev. B
SACE Tmax XT2 – XT4 | 14