Control Signal Wiring - EBARA EV-S20 Instruction Manual

Multi-stage dry vacuum pump ce / semi / nrtl model 200-220v(50/60hz)
Table of Contents

Advertisement

4.3.2 Control Signal Wiring

Connect wires to the control connector for remote operation and remote
monitoring.
Tables 4.6, 4.7, 4.8 and 4.9 and Figs. 4.6 and 4.7 show the pin assignment.
PM10U
Table 4.6 Receptacle Specification
Connector No.
CN-Z
CN-Y
Connector type
15 pin D sub-miniature Female receptacle
(In accordance with SEMI-E73)
25 pin D sub-miniature Female receptacle
P.49
EBARA
CORPORATION

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents