EBARA EV-S20 Instruction Manual page 88

Multi-stage dry vacuum pump ce / semi / nrtl model 200-220v(50/60hz)
Table of Contents

Advertisement

[ NOTE ]
DIP SW-A. No. 8
DIP SW-B. No. 1
DIP SW-B. No. 2
DIP SW-B. No.6
[ NOTE ]
DIP SW-B. No.8
DIP SW-C. No.1
PM10U
It takes ten odd seconds until the flow has stabilized after you have
operated the N
gas selector valve.
2
When dip switch-A No. 8 has been set to the REMOTE (Remote
Operation) position, it is possible to operate the Booster Pump (BP)
by selecting "AUTOMATIC Operation" or "START/STOP in
Response to External Signal Input."
When you control MP speed by external signal, set dip switch-B
No.1 to ON.
When you control BP speed by external signal , set dip
switch-B No.2 to ON.
Activate or inactive the special interface.
・ Set this to OFF to activate the interface (optional).
・ Set this to ON to inactivate the interface (default).
With this switch set to OFF, signal output from the control
signal connectors (CN-Z and CN-Y) that are directly
connected to the pump is prevented although that from the
special interface is allowed.
Locks or unlocks the currently selected operation status
display, which usually returns to the power display in 60
seconds.
This switch allows you to select "NORMAL OPEN" or
"NORMAL CLOSE" for PUMP N2 WARNING output.
P.69
EBARA
CORPORATION

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents