Servicing The Front Led/Usb Indicator Modules - Oracle Exadata X5-2 Service Manual

High capacity storage server
Hide thumbs Also See for Exadata X5-2:
Table of Contents

Advertisement

Servicing the Front LED/USB Indicator Modules

6.
Return the server to operation.
a.
Install the top cover.
See
b.
Return the server to the normal rack position.
See
Connect any required data cables to the PCIe card.
c.
Route data cables through the cable management arm.
d.
Reconnect the power cords to the power supplies and power on the server.
See
Server" on page
Use Oracle ILOM to clear any server PCIe card faults.
7.
You can use the Oracle ILOM web interface or the command-line interface (CLI) to manually
clear faults. For information on how to use the Oracle ILOM web interface or the CLI to clear
server faults, see the Oracle Integrated Lights Out Manager (ILOM) 3.2 Documentation Library
at:
http://www.oracle.com/goto/ilom/docs.
Related Information
"Remove the Sun Storage 12 Gb/s SAS PCIe RAID HBA Card" on page 124
Servicing the Front LED/USB Indicator Modules
Caution -
front LED/USB indicator module. You must disconnect the power cables before performing this
procedure.
This section covers the following topics:
"Remove the Left LED Indicator Module" on page 131
"Install the Left LED Indicator Module" on page 135
130
Oracle Exadata Storage Server X5-2 High Capacity Service Manual • January 2018
"Install the Server Top Cover" on page
"Return the Server to the Normal Rack Position" on page
"Reconnect Power and Data Cables" on page 167
167. Verify that the AC OK LED is lit.
Ensure that all power is removed from the server before removing or installing a
161.
165.
and
"Power On the

Advertisement

Table of Contents
loading

Table of Contents