Install a Power Supply
Note -
(SP) to propagate the FRU top-level indicator (TLI) data to the new power supply. For
instructions on resetting the SP, see the Oracle Integrated Lights Out Manager (ILOM) 3.2
Configuration and Maintenance Guide at http://www.oracle.com/goto/ilom/docs. Power
Supply 1 does not contain FRU TLI data, and therefore does not require an SP reset after
replacement.
Reconnect the two CMA left-side connectors.
6.
For instructions for reconnecting the CMA left-side connectors, see
Management Arm" in Oracle Exadata Storage Server X5-2 High Capacity Installation
Related Information
"Rear Panel Components and Cable Connections" on page 15
"Power Supply Status Indicators" on page 29
"Remove a Power Supply" on page 73
76
Oracle Exadata Storage Server X5-2 High Capacity Service Manual • January 2018
After you have replaced Power Supply 0, you must reset the ILOM service processor
"Install the Cable
Guide.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Exadata X5-2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents