Remove Antistatic Measures

Remove Antistatic Measures
1.
Remove any antistatic straps or conductors from the server chassis.
2.
Remove the antistatic wrist strap from yourself.
Related Information
"Take Antistatic Measures" on page 57

Reinstall the Server in the Rack

After servicing the system, reinstall it into the rack.
Caution -
Caution -
carry the chassis and install it in the rack.
1.
Lift the server from the antistatic mat, and reinstall the server into the rack.
Refer to
High Capacity Installation Guide
2.
If the cable management arm (CMA) is not installed, that is, you removed it
because you removed the server completely out of the rack, install the CMA.
For installation instructions for the CMA, refer to
Oracle Exadata Storage Server X5-2 High Capacity Installation Guide
3.
If the cables are disconnected from the rear of the server, that is, you
disconnected the cables because you removed the server completely out of the
rack, reconnect the cables.
For instructions on reconnecting cables to the rear of the server, see
"Reconnect Power and Data Cables" on page
For detailed information on connecting cables to the rear of the server, refer
to
X5-2 High Capacity Installation
164
Oracle Exadata Storage Server X5-2 High Capacity Service Manual • January 2018
Deploy any rack anti-tilt mechanism before installing the server into the rack.
The server weighs approximately 63 pounds (28.5 kg). Two people are required to
"Installing the Storage Server Into a Rack" in Oracle Exadata Storage Server X5-2
"Rear Cable Connections and Ports" in Oracle Exadata Storage Server
for the installation instructions specific to your rackmount kit.
"Install the Cable Management Arm" in
Guide.
.
167.