Required Tools

Motherboard (MB), designated as a backup quorum member.
Power supply (PS), designated as a backup quorum member.
When a server FRU that contains the KIP is removed and a replacement component is installed,
the KIP of the replacement component is programmed by Oracle ILOM to contain the same
KIP as the other two components.
Note -
be completed when two of the three quorum members contain matching key identity properties.

Related Information

"Servicing Power Supplies" on page 71
"Servicing the Storage Drive Backplanes" on page 112
"Servicing the Motherboard Assembly" on page 145
Required Tools
The server can be serviced with the following tools:
Antistatic wrist strap
Antistatic mat
No. 2 Phillips screwdriver
Related Information
"Preparing for Service" on page 47
"Servicing Components That Do Not Require Server Power-Off" on page 61
"Servicing Components That Require Server Power-Off" on page 77

Preparing the Server for Component Replacement

Note -
are necessary. See the replacement procedures for those components for more information.
50
Oracle Exadata Storage Server X5-2 High Capacity Service Manual • January 2018
Only one of the quorum members can be replaced at a time. Automated updates can only
When you are replacing the storage drives or power supplies, not all of these procedures