Power On the Server
Log in to the Oracle ILOM web interface, click Host Management → Power Control and
■
select Power On from the Select Action list.
Log in to the Oracle ILOM command-line interface (CLI), and type the following command
■
at the Oracle ILOM prompt:
-> start /System
When the server is powered on and the power-on self-test (POST) code checkpoint tests
have completed, the green Power/OK status indicator (LED) on the front panel of the server
lights and remains lit.
Related Information
"Powering Down the Server" on page 51
■
"Reconnect Power and Data Cables" on page 167
■
168
Oracle Exadata Storage Server X5-2 High Capacity Service Manual • January 2018
Need help?
Do you have a question about the Exadata X5-2 and is the answer not in the manual?
Questions and answers