G
S
ETTING
TARTED
2.2 I
NSTALLATION
2.2.1 Switching on the ATi
Place the tester on a stable, level work surface in the position where it is to be
used.
Ensure that the top surface of the tester is not fitted with any test fixture and
nothing is touching any of the test nodes. Connect the tester's line input to the
available supply, and switch on using the switch next to the line input at the
back of the ATi. 0 = off.
You must connect the power lead to a socket with a safety
!
ground contact.
When the ATi tester is switched on it performs a self-test, which lasts for about
10 seconds. During power-on self-test, you will see on information concerning
your ATi's configuration on the display, including the firmware version.
When the power-on self-test has finished, you should see the following display:
The tester is now at the top-level menu, and the softkeys allow you to select
which of the five main functions you require:
P
2-10
AGE
V
AT
U
OLTECH
I
SER
M
ANUAL
Need help?
Do you have a question about the ATi and is the answer not in the manual?