Oracle Database Appliance X7-2M Service Manual page 211

Table of Contents

Advertisement

This section describes installing the power distribution board in Oracle Database Appliance
Version 1.
Install the power distribution board into the system chassis.
1.
a.
Lower the power distribution board partially into the system [1].
Reconnect the chassis interlock switch cable [2].
b.
c.
Align the power distribution board with the two power connectors on the
disk midplane module and slide the power distribution board forward until
the connectors seat.
Appendix A • Servicing the Oracle Database Appliance Version 1
Install Power Distribution Board
211

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Database Appliance X7-2M and is the answer not in the manual?

Questions and answers

Table of Contents