Install a Power Supply
This section describes installing a Power Supply in Oracle Database Appliance Version 1.
1.
Align the replacement power supply with the empty power supply chassis bay.
2.
Slide the power supply into the bay until it is fully seated.
The release latch engages when the power supply is fully seated.
Reconnect the power cord to the power supply and verify the following:
3.
The power supply AC Present LED is lit
■
The power supply Service Required LED is off.
■
4.
Verify that the following LEDs are off:
Service Required LEDs located on the front of both server nodes
■
Appendix A • Servicing the Oracle Database Appliance Version 1
Install a Power Supply
165