Preparing Oracle Database Appliance X3-2/X4-2/X5-2 For Service; 61. If You Have Oracle Database X6-2 Series, Go To; X6-2 Series For Service" On Page; Database Appliance Version 1, Go To Service" On Page - Oracle Database Appliance X7-2M Service Manual

Table of Contents

Advertisement

Note -
Appliance library to the Oracle Server X6-2 and Oracle Server X6-2L (including Storage Server
X6-2 Extreme Flash version) documentation libraries. Use your browser's Back button to return
to the Oracle Database Appliance library.
Oracle Database Appliance X6-2S/
X6-2M
Safety Precautions
Safety Symbols
Electrostatic Discharge Safety
Required Tools
Powering Down the Server
Disconnect Cables From the Server
Extend the Server to the
Maintenance Position
Remove the Server From the Rack
Take Antistatic Measures
Remove the Server Top Cover
Preparing Oracle Database Appliance X3-2/X4-2/X5-2 for
Service
This section describes preparing Oracle Database Appliance X3-2, Oracle Database Appliance
X4-2, and Oracle Database Appliance X5-2 for service.
If you have Oracle Database X7-2 series, go to
Series for Service" on page
Oracle Database Appliance X6-2 Series for Service" on page
Database Appliance Version 1, go to
Service" on page
Most service procedures are performed on a single appliance component. Service procedures
that require a single server node to be powered off can be performed without shutting down the
entire appliance. Before powering off any component for service, refer to the Getting Started
Guide or Administration and Reference Guide for any special instructions or commands that
must be performed on the appliance to prepare it for service.
The links in the following table take you to instructions outside of the Oracle Database

61. If you have Oracle Database X6-2 series, go to

64.

Preparing Oracle Database Appliance X3-2/X4-2/X5-2 for Service

Oracle Database Appliance X6-2L
Safety Precautions
Safety Symbols
Electrostatic Discharge Safety
Required Tools
Powering Down the Server
Disconnect Cables From the Server
Extend the Server to the
Maintenance Position
Remove the Server From the Rack
Take Antistatic Measures
Remove the Server Top Cover
Remove the Server Fan Assembly
Door
"Preparing Oracle Database Appliance X7-2
"Preparing Oracle Database Appliance Version 1 for
Chapter 2 • Preparing Oracle Database Appliance for Service
Oracle Database Appliance X6-2-HA
Safety Precautions
Safety Symbols
Electrostatic Discharge Safety
Required Tools
Powering Down the Server
Disconnect Cables From the Server
Extend the Server to the
Maintenance Position
Remove the Server From the Rack
Take Antistatic Measures
Remove the Server Top Cover
"Preparing
62. If you have Oracle
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents