Toptech Systems MultiLoad II User Manual page 219

Table of Contents

Advertisement

Chapter 6 – Additive Control
(Note: If the Test Button is Enabled, the text 'Hold Test Button To Inject Now!' would appear instead of 'Press
NEXT Key to Inject Now!')
3. Place the test beaker to collect the additive injections and open the test port on the injector.
4. Press the NEXT key, or press the test button.
5. The first injection is made.
6. The number of meter pulses displays, as well as the delivered volume in gallons and in CCs (in parentheses).
7. Press the NEXT key again to get another injection. Continue to inject until you have enough volume in the
beaker to get a measurable reading.
Firmware Version 3/4.31.37
PRE #1 ADTV #1 (Adtv 001
Press Next Key to Inject Now!
Injection: 0
Meter Pulses: 0
Delivered Volume:
PRE #1 ADTV #1 (Adtv 001
Press Next Key to Inject Now!
Injection: 1
Meter Pulses: 52
Delivered Volume:
) CALIBRATE
0.000(
0cc)
Exit
) CALIBRATE
0.020(
76cc)
Exit
219

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MultiLoad II and is the answer not in the manual?

Questions and answers

Ohadugha Nnaemeka
April 3, 2025

Greetings, how can multiload ll totalizers be reset?

1 comments:
Mr. Anderson
April 3, 2025

The resettable totalizers on the Toptech Systems MultiLoad II can be reset using the CLR (Clear) key. Non-resettable totalizers cannot be reset.

This answer is automatically generated

This manual is also suitable for:

Multiload ii smpMultiload ii scsMultiload ii mobile

Table of Contents

Save PDF