Commissioning
5.10 Acceptance tests for the safety functions
5.10.2

Reduced acceptance test after expanding the function

A full acceptance test is necessary only after first commissioning. A reduced acceptance test
is sufficient when safety functions are expanded.
Table 5- 4
Measure
Changing a single limit (e.g. SLS
level).
Functional expansion of the
machine (additional drive).
Functional expansion of a drive
(e.g. additional SLS level or new
safety function following a
firmware update).
Transfer of inverter settings to
other identical machines by means
of series commissioning.
See also Section: Reduced acceptance test after component replacement (Page 266).
158
Reduced acceptance test after expanding the function
Acceptance test
Check the modified limit
value.
Check the safety functions
of the new drive.
Check the additional
functions.
Check the control and
feedback signal of all safety
functions.
Safety Integrated - SINAMICS G110M, G120, G120C, G120D and SIMATIC ET 200pro FC-2
Documentation
Supplement function table
Log modified settings
Log the new checksum
Countersignature
Supplement machine overview
Supplement order number and
firmware version of the drive
Supplement function table
Log the settings of the new
drive
Log the new checksum
Countersignature
Supplement function table
Log modified settings
Log the new checksum
Countersignature
Supplement machine
description
Log modified settings
Check the checksums
Check the firmware versions
Function Manual, 04/2014, FW V4.7, A5E34261271B AA