Chapter 4 Procedures Before Operation - Mitsubishi Electric NZ2GF2BN-60DA4 User Manual

Cc-link ie field network digital-analog converter module
Table of Contents

Advertisement

CHAPTER 4
This chapter describes the procedures before operation.
Check box
Setting a station number
Set the station number of the main D/A converter module.
When using an extension module, connect the extension module to
the main D/A converter module.
After that, mount the main D/A converter module on a DIN rail.
Carry out wiring of a power supply, Ethernet cables, and external devices
to the main D/A converter module.
When using an extension module, carry out wiring of a power supply and
external devices to the extension module.
Parameter settings and programming
Set parameters and create a program.
Offset/gain setting
To use user range, configure the offset/gain setting.
*1
To replace the module, refer to the point below.
To replace the module, follow the procedure described below:
• Turn off the module power supply and remove the D/A converter module.
• Prepare a new D/A converter module and follow the illustration above as instructed from "Setting a station
number" to "Parameter settings and programming". (No re-setting of network parameters of the master station is
required.)
• If necessary to use the user range, perform the offset/gain setting.
• Carry out operation check and then restart the control.
PROCEDURES BEFORE OPERATION
Connection
Wiring

CHAPTER 4 PROCEDURES BEFORE OPERATION

Page 49, Section 6.1
Page 50, Section 6.2
Page 52, Section 6.3
Page 57, Section 6.4
Page 59, Section 6.5
Page 62, Section 6.6
Page 68, Section 7.1
Page 75, Section 7.2
Page 136, CHAPTER 9
Page 82, Section 7.3
4
*1
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nz2ex2b-60da4

Table of Contents