Mitsubishi Electric GOT2000 Series User Manual page 289

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Step 7.
When the settings are completed, click the [OK] button to close the [System Information] window.
■3. Program example
The following describes the sequence program example.
• System information: Set the read device to D101 (using the drawing software)
• Wiring: Wire the operation switch of SW1 to X0, SW2 to X1, SW3 to X2, SW4 to X3, SW5 to X4 and SW6 to X5.
• Device allocation: The LED lit is allocated from M10 with the sequence program.
X0
.
.
.
.
.
X5
M8000
M10
Lit in green when SW1 is pressed.
M15
Lit in green if SW6 has been pressed.
D102
MOV
K2M10
Reads M10 to M17 and transfers them to device+1
9.4 Switch Wiring
9
9 - 15

Advertisement

Table of Contents
loading

Table of Contents