Mitsubishi Electric GOT2000 Series User Manual page 18

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

7.1
Connector Conversion Box .............................................................................................................. 7 - 2
7.1.1
Applicable Connector Conversion Box..................................................................................... 7 - 2
7.1.2
Connector Conversion Box (GT16H-CNB-42S) ....................................................................... 7 - 2
7.2
Emergency Stop Switch Guard Cover ........................................................................................... 7 - 19
7.2.1
Applicable emergency stop SW guard cover ......................................................................... 7 - 19
7.2.2
Installing procedure................................................................................................................ 7 - 19
7.3
Overview of Communication Cable ............................................................................................... 7 - 20
7.3.1
Installing and removing of external cable............................................................................... 7 - 21
8. WIRNG OF POWER SUPPLY SECTION
8.1
Wiring of External Power Supply ..................................................................................................... 8 - 3
8.2
Power Supply Wiring to the GOT..................................................................................................... 8 - 4
8.3
Grounding ........................................................................................................................................ 8 - 6
8.3.1
Grounding the GOT.................................................................................................................. 8 - 6
8.3.2
Causes of wiring-related malfunction and countermeasure examples..................................... 8 - 8
8.4
Wiring Inside and Outside the Control Panel ................................................................................. 8 - 10
8.4.1
Control panel inside wiring ..................................................................................................... 8 - 10
8.4.2
Control panel outside wiring................................................................................................... 8 - 10
8.5
Attaching a Surge Suppressor to Control Equipment .................................................................... 8 - 11
8.6
Grounding the Extension Unit ........................................................................................................ 8 - 12
8.6.1
Wiring of the FG cable of a bus connection cable.................................................................. 8 - 12
9.1
Internal Wiring Diagram of Handy GOT ........................................................................................... 9 - 4
9.2
Power Wiring ................................................................................................................................... 9 - 5
9.2.1
Power wiring and grounding..................................................................................................... 9 - 5
9.2.2
The cause of malfunctions related wiring/Remedy .................................................................. 9 - 6
9.3
Wiring inside and outside the panel ................................................................................................. 9 - 8
9.3.1
Wiring inside............................................................................................................................. 9 - 8
9.3.2
Outside the panel ..................................................................................................................... 9 - 8
9.3.3
Attaching surge killers to control equipment ............................................................................ 9 - 9
9.4
Switch Wiring ................................................................................................................................. 9 - 10
9.4.1
Overview for switch ................................................................................................................ 9 - 10
9.4.2
Switch wiring example............................................................................................................ 9 - 11
9.4.3
Operation switch wiring .......................................................................................................... 9 - 13
9.4.4
Operation switch input............................................................................................................ 9 - 13
9.4.5
LED setting of operation switch.............................................................................................. 9 - 14
9.4.6
Operation switch name sheet creation................................................................................... 9 - 16
9.4.7
Emergency stop switch wiring................................................................................................ 9 - 17
9.4.8
Grip switch ............................................................................................................................. 9 - 19
9.4.9
Grip switch wiring ................................................................................................................... 9 - 19
9.4.10
LED settings of grip switch..................................................................................................... 9 - 20
9.4.11
Keylock switch (2-position SW).............................................................................................. 9 - 20
10.1
Outline Procedure to Start the GOT .............................................................................................. 10 - 2
10.2
Creating Project Data .................................................................................................................... 10 - 5
A - 16

Advertisement

Table of Contents
loading

Table of Contents