Mitsubishi Electric GOT2000 Series User Manual page 147

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■7. CC-Link connection (Intelligent device station)
Step 1.
Strip off the sheath at both ends of the cable as shown in the figure below to expose braided shield for
grounding.
The braided shield sections are used for grounding with a cable clamp.
5.2.6 Grounding a cable
Step 2.
Install a ferrite core to the cable in the positions as shown in the figure below.
• CC-Link dedicated cable for connecting the GOT and PLC
GOT side
130
(5.12)
230 or less
(9.06)
• CC-Link dedicated cable for connecting the GOT and GOT
GOT side
130
(5.12)
230 or less
(9.06)
■8. External I/O device connection
Step 1.
Strip off the sheath at both ends of the cable as shown in the figure below to expose braided shield for
grounding.
The braided shield sections are used for grounding with a cable clamp.
5.2.6 Grounding a cable
Step 2.
Connect the braided shield to the connector with the connector cover.
Step 3.
Twist the power cables.
GOT side
Braided shield
Connector cover
360 or less
(14.17)
Ferrite core
(ZCAT3035-1330)
40
(1.57)
Ferrite core
(ZCAT3035-1330)
40
(1.57)
Power cable
40
(1.57)
PLC side
130
(5.12)
40
400 or less
(15.75)
(1.57)
GOT side
130
(5.12)
40
230 or less
(1.57)
(9.06)
40
360 or less
(1.57)
(14.17)
5.2 EMC Directive Requirements
Unit: mm (inch)
Unit: mm (inch)
External I/O device side
Unit: mm (inch)
5 - 15
5

Advertisement

Table of Contents
loading

Table of Contents