Mitsubishi Electric GOT2000 Series User Manual page 184

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

For GT27 except GT2715-X, GT25, and GT23 (4 fittings)
Step 3.
Remove the protective film from the GOT.
■2. GT2512F-S, GT2510F-V, GT2508F-V
To fasten the fittings on the control panel, studs are neccessary.
For the details of panel cutting dimensions and studs, refer to the following.
The following table shows the material and surface treatment of the control panel recommended for attaching the
environmental protection sheet..
*1
*2
Check that no dirt or damage is on the control panel on which the environmental protection sheet is attached.
Since the environmental protection sheet cannot be reattached, make sure to check the attachment method and attach
the sheet carefully.
After removing the protective film from the GOT, make sure that no dust or other substances adhere to the display
section.
Check that the GT25 open frame model is installed properly, and then remove the protective film from the GOT.
Do not conduct this work in a dusty place, or foreign substances may adhere to the display section.
The following shows the procedure for installing GT2512F-S as an example. In this example, the supplied fittings are
installed on the top and bottom of the GOT, and the control panel thickness is 3 mm.
6 - 32
6.6 Installing the GOT
6.2 Panel Cut Dimensions
6.3 Stud
Item
Material
Surface roughness
When you coat the environmental protection sheet, use melamine resins or acrylic resins.
The environmental protection sheet must be coated with melamine resins or acrylic resins.
Description
*1
*1
Stainless
or aluminum
or steel
Ra0.2 to 0.5 (μm)
*2

Advertisement

Table of Contents
loading

Table of Contents