Attaching Surge Killers To Control Equipment - Mitsubishi Electric GOT2000 Series User Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

9.3.3

Attaching surge killers to control equipment

If communication errors happen in synch with the on/off signals from certain control equipment (referred to as "load"
hereafter) such as no fuse breakers, electromagnetic contactors, relays, solenoid valves, and induction motors, surge noise
interference is suspected.
If this problem happens, keep the ground cable and communication cable away from the load.
If that is not possible, an installation of a surge killer will help reduce noise interference.
Place the surge killer as close to the load as possible.
• Remedy for AC inductive load
• Remedy for DC inductive load
Keep the ground cable and
communication cable away
from each other.
Output
Output equipment
such as PLC output unit
Keep the ground cable and
communication cable away
from each other.
Output
Output equipment
such as PLC output unit
C
L: Load
R
AC
Place the surge killer
near the load.
D
L: Load
DC
Place the surge killer
near the load.
9.3 Wiring inside and outside the panel
9
9 - 9

Advertisement

Table of Contents
loading

Table of Contents