Power Source Connection - Satec EM132 Installation And Operation Manual

Em13 series smart multifunction meter
Hide thumbs Also See for EM132:
Table of Contents

Advertisement

‎ C hapter 2
Installation

Power Source Connection

To connect an AC Auxiliary Power Supply (EM133 model only):
To connect to a DC Auxiliary Power Supply (EM133 and EM133-21DC models only):
32
Figure ‎ 2 -7b Terminals View EM133-SE Model
The equipment installation shall conform to the following
instructions:
a) a switch or circuit-breaker shall be included in the building
installation as close as possible to the equipment supply
voltage;
b) It shall be in close proximity to the equipment and within
easy reach of the OPERATOR;
c) It shall be marked as the disconnecting device for the
equipment.
d) Before installing, ensure that all incoming power sources are
shut OFF. Failure to observe this practice can result in serious
or even fatal injury and damage to equipment.
e) The current sensors may not be installed in a panel where
they exceed 75% of the wiring space of any cross-sectional
area within the panel.
The power source can be a dedicated fuse or a monitored voltage if it is
within the instrument power supply range.
Connect the Line wire to terminal (9).
Connect the Neutral wire to terminal (10)
Connect the positive wire to terminal (9)
Connect the negative wire to terminal (10)
EM13x Series SMART MULTIFUNCTION METER
Electrical Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Em133Em133-se

Table of Contents