Satec EM132 Installation And Operation Manual page 27

Em13 series smart multifunction meter
Hide thumbs Also See for EM132:
Table of Contents

Advertisement

Installation
‎ C hapter 2
*
1. SATEC RF chokes to be installed between CBR and Meter
2. AC0242 shall be routed with the voltage lines (bundled),
Figure ‎ 2 -6b Typical Installation Diagram with Self Energized Power Supply – direct connection with HACS
EM13x Series SMART MULTIFUNCTION METER
Voltage Inputs in residential area or other places require ANCI
C12.20 compliance. Otherwise it may be bypassed.
separately from communication & I/O lines
Electrical Installation
*
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Em133Em133-se

Table of Contents